Project details
- Client: Schmidt + Clemens factory in Spain
- Year: 2006
- Location: Murieta, Navarre, Spain
- Sector: Metalworking and electroplating
- Division: Industrial wastewater
Project description
Treatment of 4m3 wash water in the non-destructive testing process with penetrating liquids, for recycling wash water and minimizing total final waste to be managed. The 2016 increase was 15 m3/day.
Order: Treatment of 4m3 wash water in the non-destructive testing process with penetrating liquids, for recycling wash water and minimizing total final waste to be managed. The 2016 increase was 15 m3/day.
Solution:
2006: Complete vacuum evaporation treatment plant with ENVIDEST LT VS 4,500 and subsequent concentration by simple distillation with AV-110.
2016: Complete vacuum evaporation treatment plant with ENVIDEST LT VS 15,000 and subsequent concentration by simple distillation with AV-160. This plant replaces the previous.
Results
Zero discharge.